Close
LiftEx 2026
bauma SHANGHAI

TotalEnergies Takes FID for Absheron Field Gas Development

AI Summary

TotalEnergies (35%, operator), SOCAR (35%) and XRG (30%) have taken the Final Investment Decision (FID) for the Full Field Development of the Absheron gas and condensate field. The decision marks the next stage in developing the field and expanding its production capacity. Located in the Caspian Sea, 100 km south-east of Baku, the Absheron field contains approximately 140 billion cubic meters of recoverable gas reserves. The development builds on the first development phase, which was successfully put on stream in 2023 with a production capacity of 1.5 billion cubic meters per annum (BCMA) of gas and 12,000 barrels per day of condensate.

Production Expansion Planned for 2029

The Absheron Full Field development is expected to substantially increase production from the field, taking overall output to 6 BCMA of gas and 47,000 barrels per day of condensate. Project is expected to start-up in 2029. Gas produced through the development will be supplied to the domestic market as well as exported to Turkey. The exports will use the existing gas infrastructure connecting Azerbaijan to the European gas market, supporting the role of the development in strengthening regional energy security.

Low-Carbon Design and Subsea Production

The project has been designed with a focus on innovation and a low carbon footprint. Gas will be produced by 4 subsea wells before being transported to shore through a subsea pipeline equipped with advanced automation solutions. It will then be processed at a new onshore plant that will be fully electrified and designed to minimize energy consumption and greenhouse gas emissions. As a result of the design, the scope 1 & 2 greenhouse gas emissions intensity of the project stands below 4 kg CO2e/boe.

“We are pleased to announce the launch of Absheron Full Field development, a project that unlocks the full production potential of one of the Caspian Sea’s largest gas discoveries”, said Patrick Pouyanné, Chairman and CEO of TotalEnergies.

“In line with TotalEnergies’ strategy, Absheron Full Field Development is a low cost and low emissions project that will provide a long-term additional gas supply to the domestic and international markets, supporting regional energy security,” he added.

The people setting the agenda in oil and gas don’t follow the conversation. They’re usually already in it. Oil & Gas Advancement is where that conversation happens.

Reaching this audience means being present inside the editorial they trust to navigate one of the world’s most complex and fast - moving industries. Our 2026 Media Pack shows you where to be seen:

Magazine & Digital

Where the people running oil and gas operations go to stay ahead. Your brand should be visible when they arrive.

Insights & Reports

The data and analysis the industry turns to when the market shifts. Worth being part of.

Brand Authority

Consistent presence in trusted editorial builds the kind of reputation that paid placement alone can’t create.

SUBSCRIBE OUR NEWSLETTER

WHITE PAPERS

U.S. Mulls USD 5B Fund to Restore Middle East Energy Infrastructure

The U.S. administration has proposed a $5 billion investment fund aimed at helping rebuild energy infrastructure damaged during the war with Iran while supporting...

RELATED ARTICLES