Decommissioning and Abandonment Australia 2026

ABB wins $120m deal for Chevron’s Jansz-Io project off Australia

AI Summary

ABB will supply the overall electrical power system (EPS) for the multi-billion dollar Jansz-Io Compression (J-IC) project offshore Australia after winning contracts with Chevron and Aker Solutions worth $120 million.

ABB said today that work will start immediately on the subsea compression system, that will bolster the Chevron-led Gorgon liquefied natural gas (LNG) project. It is expected to be operational in 2025. ABB’s order will be booked in Q3 2021.

“The project will involve the construction and installation of a 27,000-tonne topside and hull normally unattended floating field control station (FCS), approximately 6,500 tonnes of subsea compression infrastructure and a 135km submarine power cable linked to Barrow Island,” said ABB.

ABB will provide the majority of the electrical equipment, both topside and subsea, for J-IC. The project will combine two core ABB technologies – power from shore and Variable Speed Drive (VSD) long step-out subsea power – for the first time. The electrical system will be able to transmit 100 megavolt-amperes over a distance of approximately 140 kms and at depths of 1,400 meters.

The contract was awarded following concept development and a front-end engineering and design (FEED) study.

“This game changing technology significantly reduces power consumption and emissions compared to power generated offshore by local gas turbines and compressors located topside,” said Brandon Spencer, president, energy industries at ABB.

“Subsea compressors are key to helping improve reservoir recoverability and ensuring optimal use of resources from existing fields,” added Spencer.

Maria Peralta, subsea executive vice-president at Aker Solutions said “this is a very important project for us as it supports our commitment to enable lower-carbon oil and gas production and develop renewable solutions to meet future energy needs. We are pleased to once again be joining forces with ABB to take subsea solutions to the next level and accelerate the transition to sustainable energy production.”

The Chevron-led Gorgon LNG venture in Australia said last month that it will proceed with the $4 billion investment for the Jansz-Io compression development that will keep customers in Asia supplied with gas for decades. Significantly, the subsea compression project, needed to move the gas from the deep seas to shore, will be the first of its kind outside of Norway.

Chevron said the Jansz-Io Compression (J-IC) project marks the US giant’s most significant capital investment in Australia since the approval of Gorgon Stage 2 in 2018.

The project, which is expected to take five years to complete, will improve gas recovery from offshore wells at the Jansz-Io field and help keep the three-train 15.6 million tonne per year LNG export plant filled for decades.

 

The people setting the agenda in oil and gas don’t follow the conversation. They’re usually already in it. Oil & Gas Advancement is where that conversation happens.

Reaching this audience means being present inside the editorial they trust to navigate one of the world’s most complex and fast - moving industries. Our 2026 Media Pack shows you where to be seen:

Magazine & Digital

Where the people running oil and gas operations go to stay ahead. Your brand should be visible when they arrive.

Insights & Reports

The data and analysis the industry turns to when the market shifts. Worth being part of.

Brand Authority

Consistent presence in trusted editorial builds the kind of reputation that paid placement alone can’t create.

SUBSCRIBE OUR NEWSLETTER

WHITE PAPERS

Türkiye Proposes Energy Corridor to Bolster Energy Security

Türkiye's resident Recep Tayyip Erdoğan and Energy Minister Alparslan Bayraktar detailed an expansive Türkiye energy corridor strategy on 22nd May 2026 aimed at redefining...

RELATED ARTICLES