OGU Oil & Gas Uzbekistan 2026

Shell and BP yet to meet UAE’s demand for $2.2bn sign-on-fee for oil concession

Shell and BP are yet to meet the UAE’s demand for a $2.2bn sign-on fee even though it has been nearly two months after the country put a deadline for the bids on a large oil concession.

Although BP and Shell are bidders for a 40-year contract, there is a standoff over the terms, reported The Wall Street Journal.

Their hesitation to meet the UAE demand indicates they may have to lose a large field in the oil-rich nation.

“The UAE plans to increase overall production capacity by 16% to 3.5 million barrels by 2017.”

Exxon Mobil already left the bidding process following the expiry of its 75-year license in January 2014. In January, Total agreed on a $2.2bn sign-on fee to acquire a 10% interest in a concession.

The UAE demanded the same fee from BP and Shell and gave them a 10-day deadline.

However, BP and Shell, similar to several other oil companies have been hit hard by a decrease in oil prices. As a result, both firms had to cut spending and reduce staff.

The concession, which covers 15 onshore fields, will be overseen by local firm Adco. This concession represents nearly 50% of the UAE’s crude output, reported the publication.

By 2017, the country expects production to reach 1.8 million barrels a day. The UAE plans to increase overall production capacity by 16% to 3.5 million barrels by 2017.

SUBSCRIBE OUR NEWSLETTER

WHITE PAPERS

Efficient Tubular Supply Drives Faster Project Startups

Launching a new upstream project requires the seamless integration of engineering, logistics, and material procurement. Efficient tubular supply drives faster project startups by ensuring that casing and tubing are staged and ready before the rig arrives, minimizing the risk of delays and enhancing the overall operational readiness of the drilling team.

RELATED ARTICLES