Decommissioning and Abandonment Australia 2026

Halliburton achieves first installation of Smartplex downhole control system

AI Summary

The installation was a joint effort across functional teams within the Intelligent Completions group, and was the first electro-hydraulic system installed by Halliburton in the Middle East. The installation was completed with zero non-productive time and no HSE issues.

The SmartPlex downhole control system enables remote actuation of downhole control devices using electro-hydraulic control lines from the surface. The multi-drop system provides simple and reliable zonal control of up to 12 interval control valves in a single wellbore, using a minimum number of control lines.

Oil and gas markets don’t shift gradually — they move in moments. The professionals who see those moments coming don’t have better instincts. They have better information.

The Oil & Gas Advancement briefing delivers that information — covering upstream, midstream, and downstream developments, energy transition strategy, and market intelligence across every major producing region.

  • The stories oil and gas professionals will be discussing tomorrow, in your inbox today
  • Analysis that goes beyond the headline — written for readers who already understand how the market works
  • The briefing that the sector’s most informed professionals open first

SUBSCRIBE OUR NEWSLETTER

WHITE PAPERS

MOL Invests in Landmark Delfin FLNG 1 Project in the U.S.

Mitsui O.S.K. Lines, Ltd. (MOL) has officially joined an offshore floating liquefied natural gas ("FLNG") development as an investor following a Final Investment Decision...

RELATED ARTICLES